Case #11-16V 122 Maplewood Drive Zone R-1 Stalwart Construction, appellant Appellant is requesting variances from ACC 23.03.03(B) to construct an accessory structure with a side street setback of two feet (2’) where twelve point five feet (12.5’) is the minimum requirement, and from ACC 23.10.01, Table A, Schedule of Bulk Controls, to allow lot coverage of forty-three percent (43%), where thirty percent (30%) is the maximum allowed.
Case #11-17C Outlets 114-118 partial - West Union Street Zone R-3 Horizon Telcom, appellant Appellant is requesting a conditional use permit to allow construction of a utility station (fiber optic equipment shelter).
Case #11-18V 762 West Union Street Zone B-3 Steven F. Bush, appellant Appellant is requesting a variance from ACC 23.04.07(A) [referencing ACC 23.04.05(A)(1)] to allow residential use (one apartment) on the first floor of a building located in a B-3 zone, where such use is not permitted.
Case #11-16V 122 Maplewood Drive Zone R-1 Stalwart Construction, appellant Appellant is requesting variances from ACC 23.03.03(B) to construct an accessory structure with a side street setback of two feet (2’) where twelve point five feet (12.5’) is the minimum requirement, and from ACC 23.10.01, Table A, Schedule of Bulk Controls, to allow lot coverage of forty-three percent (43%), where thirty percent (30%) is the maximum allowed.
Case #11-17C Outlets 114-118 partial - West Union Street Zone R-3 Horizon Telcom, appellant Appellant is requesting a conditional use permit to allow construction of a utility station (fiber optic equipment shelter).
Case #11-18V 762 West Union Street Zone B-3 Steven F. Bush, appellant Appellant is requesting a variance from ACC 23.04.07(A) [referencing ACC 23.04.05(A)(1)] to allow residential use (one apartment) on the first floor of a building located in a B-3 zone, where such use is not permitted.